Permits, extensions, new houses

Plans that get through the planning office the first time.

We draw your extension, your raised roof or your house, put together a complete permit application and answer the planning office for you. You know the review time before filing.

Beyond 150 m² of floor area, a permit must be drawn up by an architect, extensions included.

ProjectYour extension or your house
PhaseSketch, permit, works
Scale1:100, then 1:50
Send your project

Built from our drawings

All projects

House among the vines

A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.

Saint-Cyr-au-Mont-d'Or2025Timber frame, larch cladding, wood fibre insulation11 months on site

Restored stone farmhouse

A farmhouse brought back to life: lime render, oak joinery and a barn turned into a living room.

Lozanne2024Rubble stone, lime render, oak joinery9 months on site

Glass extension on a 1930s house

A 38 m² kitchen and dining room opening onto the garden, under a building permit.

Caluire-et-Cuire2025Steel frame, full-height glazing, reclaimed brick6 months on site

Revision table

Each index is a stage you validate before the next one starts.

A

Survey and sketch

The site or the existing house measured, the planning rules read, a first sketch.

B

Permit drawings

Site plan, plans, sections, elevations, insertion images and forms.

C

Filing and review

One month for a planning declaration, two for a house permit, three for other buildings.

D

Construction drawings

The details the builders need to price and build the same thing.

E

Site and handover

Weekly visits if you entrust us with the works, then the handover in writing.

Notes on the drawing

A registered architect

Registered with the Order of Architects and insured for every project, the certificate attached to the contract.

A written contract

The mission, its stages and the fee, signed before the first drawing.

A complete file

Every document the form asks for, so the review period starts on the day of filing.

The appeal period

Once the permit is displayed on site, neighbours have two months to appeal. We tell you when it ends.

Permit granted in two months, no request for missing documents. The builders started on the planned date.
Romain T.Extension, Caluire-et-Cuire
We were at 162 m² with the extension: we did not know an architect was compulsory. They explained it on the first call.
Nadia and Luc F.Raised roof, Villeurbanne
Clear plans, and the planning office questions answered within the week.
Gérard M.Garage conversion, Écully

Send us your project for a first reading.

The address and what you want to build. We tell you which procedure applies and what the file will need, within two working days.

04 78 00 11 22